Build more. Wait less

New Time Construction is a proven steel modular building system for developers and capital partners who want less uncertainty between investment and income. Swedish engineering, factory precision, flexible architecture — and a track record that already exists.

11completed projects
2,260apartments completed
89,688 m²completed GFA
~13 monthsaverage build time

The cost of waiting

The biggest risks in residential development are rarely the idea. They are what happens between the investment decision and a stabilized asset: time, cost drift, site complexity and technical surprises. New Time Construction is designed to compress that uncertainty.

Revenue sooner

Factory production and site preparation run in parallel. The goal is simple: bring completed homes to market sooner and shorten the period before rental income starts.

Less capital tied up

A factory-driven, milestone-based delivery model lets capital follow real project progress instead of sitting inside a long, sequential construction cycle.

Fewer budget surprises

Standardized engineering, repeatable components and controlled production reduce the variables that typically appear late on a conventional construction site.

Technical risk designed out

A stiff steel structure, dedicated fire and moisture assessments, minimal organic material in the structure and acoustic isolation are built into the system — not added as afterthoughts.

A better asset after handover

Strong energy performance and locally serviceable components support lower operating complexity and a building designed to perform well beyond practical completion.

Modular is the category. This is the difference.

Every modular supplier can say faster, cheaper and greener. New Time Construction earns the choice in the details.

Proven, not promised.

11 completed projects since 2018. 2,260 apartments. Almost 90,000 m² of completed GFA. Plus 377 apartments currently under construction at Gävle Herakles.

Steel where it matters.

The self-supporting steel truss enables longer modules, greater height potential and higher torsional stiffness — reducing the risk of cracks and on-site rework.

Built for real sites.

Loads are carried through columns, simplifying garages and commercial ground floors. The system is designed to adapt to the site instead of forcing the site to adapt to the module.

Architecture without the box.

The industrial logic stays inside. Façade, roof, balconies, windows and volume can respond to the location — with timber, brick, render or panel systems already proven.

Energy with proof.

At Gävle Herakles, the design reaches 41.2 kWh/m² Atemp/year against a BBR 29 requirement of 84.2 — including a 10% safety margin.

Capital-minded delivery.

Parallel workflows and milestone-based payments are designed around how developers deploy capital — not around how a traditional construction sequence has always worked.

Proof before promises.

Click a project to see images.

Spånga Ferdinand — Completed 2024 • 1,043 apartments • 30,800 m² GFA • 18 months
Karlstad Munspelet — Completed 2022 • 208 apartments • 7,000 m² GFA • 12 months
Gävle Sätra — Completed 2022 • 163 apartments • 7,640 m² GFA • 12 months
Falun Tegelbruket — Completed 2023 • 123 apartments • 5,727 m² GFA • 12 months
Norrköping Ankarstocken — Completed 2024 • 198 apartments • 6,837 m² GFA • 14 months

Plus: Gävle Herakles — 377 apartments / 13,211 m² GFA — currently under construction.

Video

See the system in action.

Watch the video →

Contact

Bring us the site. We’ll build the route to delivery.

Wanli Liu

CEO

wanli.liu@newtime.se
+46 706 398 398

Richard Lantz

Deputy CEO, Head of Business Development

richard.lantz@newtime.se
+46 737 107 610

Nicklas Palm

Head of Production

nicklas.palm@newtime.se
+46 702 510 293

New Time Construction AB
Skolgatan 97, 903 31 Umeå
Org.nr 559236-6255