Factory-built apartment buildings with a high degree of automation

Build more. Wait less.

New Time Construction develops and delivers modular, energy-efficient apartment buildings for property owners. The modules are built with complete interiors in our factory, while the foundations are completed on site.

Spånga Ferdinand, completed 2024
Why New Time

A shorter route from investment to rental income

The biggest risks in residential development are rarely the idea. They lie in what happens between the investment decision and a completed building: time, cost drift, a complex construction site and technical surprises. Our system is designed to reduce that uncertainty.

Revenue sooner

Factory production and groundwork run in parallel. Completed homes reach the market faster, and rental income starts earlier.

Less capital tied up

Payments follow milestones that track the project's actual progress – see the payment plan.

Fewer budget surprises

Standardised engineering, repeatable components and controlled production reduce the variables that usually appear late on a conventional site.

Steel where it matters

The self-supporting steel truss allows longer modules, taller buildings than timber modules and high torsional stiffness – less risk of cracks and rework.

Built for real sites

Loads are carried through columns, which simplifies garages and commercial ground floors. The system adapts to the site – not the other way round.

Architecture without the box

The industrial logic stays inside. Façade, roof, balconies, windows and massing respond to the location – in timber, brick, render, panels or slate.

The factory and the process

Built in the factory, finished on site

Steel frame, interior fit-out, tiling and building services are all completed indoors in the factory, protected from the weather. When the modules are lifted into place, the building is essentially finished inside.

  • 98% complete on delivery. The modules leave the factory with their interiors complete.
  • All tiling is done by robots. Wall and floor tiles are laid by robots in the factory, giving consistent quality in every apartment.
  • Roughly half the construction time. The modules are built while the foundations are laid, giving roughly half the construction time of conventional building with precast concrete.
  • About 13 months on average. Average construction time across our 11 completed projects, 11–18 months per project.
A robot laying tiles on a wall panel in the factory
Robotic tiling in the factory
Modules for Gävle Herakles in the factory hall
Herakles modules in the factory hall
A finished module being lifted in the factory
Lifting a finished module
Kitchen and living room in a Gävle Herakles apartment, with beige kitchen fronts and light oak parquet
Kitchen, Gävle Herakles · Visualisation: SPG

From enquiry to move-in

  1. Enquiry and design

    We review the site, the zoning plan and your needs, and prepare a proposal.

  2. Order and manufacturing

    The modules are built in the factory while groundwork is under way.

    15%
  3. Delivery and assembly

    The modules are delivered and assembled on site.

    70% + 10%
  4. Final inspection and move-in

    Once the final inspection is approved, residents can move in.

    5%
Payment plan

Capital follows the project

Payments are tied to clear milestones – not to a long, sequential construction process.

  • 15%on order
  • 70%on delivery, 60-day payment terms
  • 10%three months after delivery
  • 5%after approved final inspection
Ongoing project

Gävle Herakles – Makaronifabriken

In the Söder district of Gävle, close to the central station and the Gavleån river, we are building the Herakles block for SPG, which markets it as Makaronifabriken (“the Macaroni Factory”). The façade is slate.

  • 377apartments
  • 13,211 m²gross floor area
  • ~15 monthsconstruction time
  • Energy class A41.2 kWh/m² Atemp per year
  • Energy use of 41.2 kWh/m² Atemp per year – less than half the 84.2 required by the Swedish building regulations (BBR 29), including a 10% safety margin
  • Balanced ventilation with heat recovery (FTX) in every apartment: the unit sits in a kitchen cabinet, with a separate filter box that is changed from the corridor
  • Solar panels, green courtyards and a roof terrace with sauna
  • Apartments of 24–65 m², 1–3 rooms, with a balcony, patio or French balcony in almost every one
  • Oak parquet, fully tiled bathrooms and kitchens with induction hob and integrated microwave
  • Garage with EV charging and a bike pool with cargo bikes

Client: SPG. Move-in planned for 2027, according to SPG. Atemp is the heated floor area used in Swedish energy calculations. Energy class A is the top grade in Sweden's A–G energy performance classes.

References

Proven, not promised

Eleven completed projects across Sweden since 2018 – from Umeå to Spånga (Stockholm) – for property owners such as Amasten, SBB and SBS. Click a project name marked “Photo” to see an image.

Completed projects and the ongoing Gävle Herakles
ProjectYearApartmentsGFA m²Build timeClient
Gävle HeraklesOngoing–37713,211~15 moSPG
20241986,83714 moSBS
20241,04330,80018 moSBS
20231235,72712 moSBB
20221637,64012 moSBB
20222087,00012 moSBS
Örnsköldsvik Ålen2021764,60012 moSBB
Luleå Sovsäcken2021493,21012 moSBB
Knivsta Gredelby202117010,35014 moAmasten
Sjöberg Sjöstjärnan20201067,50514 moAmasten
Timrå Vivsta2019482,51711 moAmasten
Umeå Vätten2018763,50211 moOwn development

Total for the eleven completed projects: 2,260 apartments and 89,688 m² gross floor area (GFA).

Sustainability and quality

Proven energy performance, factory quality

The figures below are for Gävle Herakles, where energy performance was simulated in IDA ICE by a Swedish energy consultant.

Energy class A

The top grade in Sweden's energy performance classes (A–G). 41.2 kWh/m² Atemp per year against the BBR 29 requirement of 84.2 – less than half, including a 10% safety margin.

Miljöbyggnad 3.1

The energy performance corresponds to Gold on the Energy use indicator (Miljöbyggnad 3.1, Swedish green building certification).

Tight building envelope

Average U-value of 0.32 W/m²K against the Swedish regulatory limit of 0.40.

Steel frame, lower carbon footprint

40% less CO₂ compared with traditional on-site construction.

Acoustics and fire safety

Meets the Swedish building regulations (BBR), with acoustic and energy performance better than required. Fire and moisture consultants, and CE-marked phenolic insulation fire-tested at RISE (Research Institutes of Sweden).

Interiors close to condominium standard

Fully tiled bathrooms with robotic tiling, balconies where the zoning plan allows, and carefully chosen materials.

Film

See the system at work

From the factory line to a finished building in three minutes.

The film loads from YouTube (youtube-nocookie.com) only when you click.

FAQ

Questions we often get

How long does construction take?

About 13 months on average across our 11 completed projects, and 11–18 months per project depending on size. The modules are built in the factory while the foundations are laid, giving roughly half the construction time of conventional building with precast concrete.

How complete are the modules on delivery?

98% complete. The modules leave the factory with their interiors finished, including tiling, fit-out and building services.

Can the façade be adapted?

Yes. Façade, roof, balconies, windows and massing are adapted to the location. We have built with timber, brick, render and panels, and Gävle Herakles has a slate façade. The property owner chooses the expression.

How tall can you build?

The self-supporting steel truss allows longer modules and taller buildings than timber modules. The achievable height depends on the project – contact us and we will go through the conditions.

Does it work with garages and commercial ground floors?

Yes. Loads are carried through columns, which simplifies garages and commercial space on the ground floor.

What ventilation is used?

At Gävle Herakles, every apartment has balanced ventilation with heat recovery (FTX). The unit sits in a kitchen cabinet, with a separate filter box that is changed from the corridor.

How does payment work?

In milestones: 15% on order, 70% on delivery (60-day payment terms), 10% three months after delivery and 5% after the approved final inspection.

Contact

Have a site? We build the road to move-in.

Get in touch with one of us directly. We work in Swedish and English.

Richard Lantz

Deputy CEO, Head of Business Development

richard.lantz@newtime.se
+46 737 107 610

Nicklas Palm

Head of Production

nicklas.palm@newtime.se
+46 702 510 293

New Time Construction AB · Corporate ID no. (org.nr) 559236-6255